Installation Guide: NexBot Drives AC111-002 Ac Servo Motor
SKU: NXB-SRV-AC111-002 | Revision: 1.0 | Category: Drive Systems > Servo Motors > AC Servo Motors
DANGER: Disconnect all power sources before beginning installation.
Follow lockout/tagout (LOTO) procedures per OSHA 1910.147.
1. Required Tools & Materials
2. Pre-Installation Checks
- Verify the motor nameplate SKU matches the order: NXB-SRV-AC111-002.
- Inspect the motor housing, shaft, and connectors for any signs of shipping damage.
- Confirm the mounting surface is clean, flat, and structurally rigid to handle the motor's 2.1 Nm torque.
- Ensure the servo drive controller is powered down and Lockout/Tagout (LOTO) procedures are in effect.
- Verify the drive's three-phase output is configured for 400VAC operation.
- Check that the machine environment conforms to the IP65 rating requirements, especially regarding fluid exposure.
3. Installation Procedure
Step 1: Mechanical Mounting
Position the AC111-002 motor on the mounting surface, ensuring the pilot is correctly seated. Insert and hand-tighten the M6 mounting bolts through the 86 mm frame flange.
Step 2: Torqueing Mounting Bolts
Using a calibrated torque wrench, tighten the mounting bolts in a star pattern to the specified torque value listed in the machine's assembly drawings. This ensures even pressure on the motor flange.
Warning: Uneven or excessive torque can distort the motor flange, leading to misalignment and premature bearing failure. Do not exceed the recommended torque.
Step 3: Shaft Coupling and Alignment
Align the motor shaft with the load shaft using a precision alignment tool. Install the shaft coupling as per the coupling manufacturer's guidelines, ensuring minimal angular and parallel misalignment.
Warning: Poor alignment is a primary cause of vibration and bearing damage. Re-verify alignment after the coupling is fully installed.
Step 4: Connecting Power Cable
Connect the shielded three-phase power cable to the motor's power input connector. Ensure the U, V, W phases and the Protective Earth (PE) ground are connected to the correct pins.
Warning: Risk of electric shock. Ensure all power is off and locked out. Incorrect phase wiring will cause uncontrolled motor rotation or damage.
Step 5: Connecting Encoder Cable
Connect the shielded encoder feedback cable to the motor's signal connector. Secure the connector's locking mechanism to ensure a reliable connection and maintain the IP65 seal.
Warning: The encoder signal is sensitive to electrical noise. Route this cable separately from high-voltage power cables.
Step 6: Connecting PROFINET Cable
Attach the shielded PROFINET cable to the designated communication port on the motor. Ensure the connector is fully seated and locked to establish a stable network link.
Step 7: Cable Management and Strain Relief
Secure all cables to the machine frame using appropriate clamps, providing strain relief. Leave a service loop with a gentle bend radius to prevent stress on the motor connectors during axis movement.
Warning: Inadequate strain relief can lead to intermittent connections and eventual cable failure.
4. Post-Installation Verification
- Visually re-inspect all electrical connections to ensure they are secure and correctly terminated.
- Remove all tools, hardware, and foreign objects from the work area.
- With the motor decoupled from the load, apply power to the servo drive and check for any fault codes.
- Perform a low-speed jog test to confirm the direction of rotation is correct as per the system design.
- Check the PROFINET network status to confirm the motor is online and communicating with the PLC.
- After successful checks, power down, reconnect the load coupling, and prepare for system tuning.
Note: For technical support, contact your authorized service provider